Building & Industrial Services

Pumps, Valves & Plumbing Equipment for Projects

Project-based supply of pumping, flow-control and plumbing equipment, coordinated with approved technical requirements.

  • Water supply, transfer, drainage and circulation pumps
  • Isolation, check and control valves
  • Pipes, fittings and plumbing accessories
  • Equipment selection aligned with BOQ and specifications
Flow systems, coordinatedEquipment and accessories selected around application, duty and approved project documents.

Reliable equipment packages for water systems

HERAMB supports building and industrial projects with pumps, valves, plumbing equipment and related accessories. Share the application, duty requirements, materials, connection details and approved makes so the equipment package can be reviewed against the project specifications.

Final pump duties, pressure ratings, materials and quantities should follow the approved design and project documents.

Illustration of plumbing pipes, valves, water pump and storage tank
Illustrative equipment graphic; final make and specifications follow approved project documents.

Pumping, flow control and plumbing

Product selection depends on the system application and technical schedule.

Pumps & Pump Sets

  • Water supply pumps
  • Transfer and circulation pumps
  • Booster and pressure sets
  • Pump accessories per project schedule

Valves & Flow Control

  • Ball and gate valves
  • Butterfly valves
  • Check valves (NRV)
  • Plumbing control valves

Pipes & Fittings

  • Pipes and fittings
  • Flanges and couplings
  • Supports and connection items
  • Jointing and sealing accessories

Building Plumbing

  • Water storage tanks
  • Drainage products
  • Water-pressure components
  • Installation accessories per BOQ

From BOQ review to delivery planning

Share the relevant documents to align equipment selection and supply scope.

01

Scope Review

Review the BOQ, pump schedule, piping requirements and approved makes provided for the project.

02

Equipment Coordination

Align product details, accessories and quantities with the project duty and specification documents.

03

Supply Planning

Coordinate supply and delivery schedule around the agreed project package and site requirements.

Have a pump schedule or plumbing BOQ?

Send your project requirements

Include flow, head, material and connection specifications if available.

Send Enquiry