Hydrant Equipment
- Landing and hydrant valves
- Hose reels, hose pipes and accessories
- Branch pipes and nozzles
- Fire brigade inlet connections
- Hose cabinets and accessories
Project-based equipment supply with installation, testing and integration support arranged to the agreed project scope.
HERAMB supports fire-protection requirements for building and infrastructure projects. Equipment can be scoped against the project BOQ, technical specifications and approved makes, then coordinated for delivery. Where the project scope includes site work, installation, testing and integration can be discussed as part of the engagement.
Our focus is bulk and project-based requirements for commercial buildings, factories, warehouses, institutions and infrastructure projects.
Exact makes, ratings and quantities are confirmed against approved project documents.
Choose the level of support that fits the project package and site requirements.
Equipment supplied against the approved BOQ and agreed delivery schedule.
Supply with site fixing, alignment and pre-commissioning when included in the agreed scope.
Project coordination, supply, installation, testing, commissioning and handover as defined in the project scope.
Equipment mix, documentation and site requirements are considered for each project sector.
Equipment makes, ratings and technical specifications are checked against the approved BOQ, consultant requirements, project specifications and client approvals. If a substitution is needed, it is proposed for review and progressed only after written approval from the relevant project authority.
Product-line credentials or manufacturer relationships are shared only when relevant to a specific requirement and supported by applicable documentation.
HERAMB focuses on bulk and project requirements. Share the item list, quantity and site details so the scope can be reviewed.
Yes. Share the BOQ and related specifications so the requested equipment, makes and quantities can be reviewed against the project documents.
Installation, testing and commissioning can be discussed when they form part of the agreed project scope and site requirements.
Selection follows the approved BOQ, technical specifications and consultant or client approvals. Proposed substitutions are sent for written approval before proceeding.
Send your project details through the enquiry page and include a BOQ or specifications if available.